The BC Energy Step Code is the Province’s new building energy code, involving a series of “Steps” representing improving energy performance levels. It measures the performance of different parts of the building, such as its airtightness level, envelope thermal performance, and mechanical equipment efficiency. The BC Energy Step Code will improve home comfort and air quality while reducing energy costs and greenhouse gas emissions from new buildings in Abbotsford.
BC Building Code 2018 Revision 5
BC Building Code 2018 Revision 5 was effective May 1, 2023 and applies to building permits applied for on or after May 1, 2023. The BC Building Code changes signed by the Minister of Housing in February 2023 will enable 20% better energy efficiency for new construction in Abbotsford and support the goals of the provincial CleanBC plan.
Current Workshops and Webinars
September 2025 Workshop Series: Achieving Air Tightness with Confidence
The City of Abbotsford is offering two workshop sessions on achieving airtightness in September 2025. These two sessions are delivered in distinct formats: one as a hands-on lab practical session and the other as an in-person classroom session. Each is designed to keep participants engaged while building the skills needed to achieve airtightness with confidence.
September 16 OR 18 - Advanced Airtightness Hands-on Practice Workshop
*The Advanced Airtightness Hands-on Practice Workshop will be offered twice, repeating on September 16 and 18 to allow for scheduling flexibility.
Location: BCIT High Performance Building Lab, 4700 Willingdon Ave., Burnaby.
8 CPD Credits Available
September 24 - Airtightness Lab-to-Jobsite Workshop
Location: Ag-Rec Centre (Abbotsford Exhibition Park), 32470 Haida Dr, Abbotsford.
4 CPD Credits Available
The workshops are suitable for builders, architects, designers, building inspectors, energy advisors, contractors, trades professionals, real estate agents, and those interested in high performance building systems, processes and best practices.
These workshops are delivered in partnership with, City of Chilliwack and City of Mission, BCIT, Canadian Homebuilder’s Association Fraser Valley, and funded by BC Hydro and FortisBC.