Road Resurfacing Program

Road infrastructure is vital to the community and ensures the City can support a vibrant economy by ensuring the movement of goods, services and people from point A to point B in an efficient and safe manner. The City utilizes a Pavement Management System which, based on pavement condition, traffic volume and vehicle weights, predicts how the pavement will deteriorate over time. Staff use this model to predict when the roads should be resurfaced to obtain maximum service life, at least cost, and to avoid expensive reconstruction.

2026 Road Resurfacing Program

Abbotsford Way: Marshall Rd to South Fraser Way
Bell Rd: Fore Rd to Hargitt St
Bradner Rd: Haverman Rd to Myrtle Ave
Clearbrook Rd: Melmar Ave to South Fraser Way
Elm St: Gladys Ave to Walnut Ave
Harris Rd: Beharell Rd to East End
No.3 Rd: Tolmie Rd to East End
North Parallel Rd: Southwest End to No 4 Rd
Old Clayburn Rd: Laburnum Ave/Sandy Hill Rd to Shearwater Dr
Ross Rd: Maclure Rd to North End