Willband Creek Detention Pond (South) Control Structure Replacement
Project Type: Utilities & Infrastructure
Project Status: Current
Project Description
The two existing weir structures that regulate water levels in the Willband Ponds have reached the end of their service life and need to be replaced. This project will ensure continued effective water management.
Location
Bateman Road and Highway 11