Flood Recovery (Atmospheric Event 2021)
Project Type: Utilities & Infrastructure
Project Status: Current
Project Description
| Project | Details | Current Phase | Construction Dates | Project Contact |
|---|---|---|---|---|
| Lakemount Road Bridge | Permanent replacement of Lakemount Road Bridge over Sumas River that was washed out | Design | March 2027 to December 2027 | Ali Janjiana |
| Lower Sumas Mountain Road Stabilization | Road re-paving on Lower Sumas Mountain Road | Construction | April to July 2026 | Ali Janjiana |
| Saar Creek Dike Maintenance | Sumas River dike maintenance and irrigation project supports the Provincial Flood Recovery Program through maintenance activities across multiple dike sites to ensure continued protection and system resilience. | Construction | June to September 2026 | Ali Janjiana |
| Sumas River Dike Maintenance | Sumas River dike maintenance and irrigation project supports the Provincial Flood Recovery Program through maintenance activities across multiple dike sites to ensure continued protection and system resilience. | Construction | June to September 2026 | Ali Janjiana |