Culverts

Project Type: Utilities & Infrastructure
Project Status: Current
Project Description
ProjectDetailsCurrent PhaseConstruction DatesProject Contact
Auguston Parkway South Culvert Replacement Phase 2 Reinstatement of the flow control structure, overflow pipe and emergency overflow back into serviceDesignAugust to December 2026Riwaj Adhikari
Bradner Road Culvert Replacement (5081 Bradner Rd)Replacement of a deteriorating culvertDesignJune to September 2026Riwaj Adhikari
Downes Road Culvert RepairReplace failing concrete pipe with new pipe by pipe bursting methodsDesignAugust to October 2026Tony Seibert
Gladys Avenue Culvert ReplacementReplacement of an existing and aging culvert under Gladys Avenue and the SRY rail tracks, near Sentinel Drive. The need for this project was identified in the City's master plan drainage modelling document, the Willband Creek ISMP. DesignJune to December 2027Aaron Klemets
King Road Culvert RepairRepair failing culvert by relining interior DesignAugust to December 2027Tony Seibert
Lefeuvre Road Culvert RepairRepair failing culvert by slip lining DesignAugust to December 2028Tony Seibert
Livingstone Avenue and Fishtrap Creek Culvert ReplacementReplacement of a deteriorating culvert that conveys Fishtrap Creek under Livingstone AvenueDesignAugust to December 2027Riwaj Adhikari