James Plant
Print

Fraser River Sanitary Forcemain

The existing 600mm diameter steel siphon sanitary main, from Mission to the JAMES Wastewater Treatment Plant (WWTP) in Abbotsford, was installed across the Fraser River in 1982, downstream of the Mission Bridge.

The District of Mission is now planning for a new sanitary sewer pipe, in parallel with the existing main, to increase capacity and provide redundancy to the existing forcemain.

The project is being delivered as two separate distinct contracts; the Land Contract and the River Contract. Both contracts are anticipated to be completed in the 2018/2019 fiscal year. Additional project information and the construction schedule is available on the Fraser River Sanitary Forcemain on the District of Mission's website.