Road Resurfacing Program


Road Resurfacing Program

The City of Abbotsford manages approximately 2,100 lane kilometers of road infrastructure estimated to be approximately $1.4 billion in value. Road infrastructure is vital to the community and ensures the City can support a vibrant economy by ensuring the movement of goods, services and people from point A to point B in an efficient and safe manner. 

In order to maintain the roads, the City utilizes a Pavement Management System which, based on pavement condition, traffic volume and vehicle weights, predicts how the pavement will deteriorate over time. Staff use this model to predict when the roads should be resurfaced to obtain maximum service life, at least cost, and to avoid expensive reconstruction.  

Back to top


Project Overview

In order to maximize the service life and keep the City’s road network safe, Council approved a budget of $4 million to apply surface treatment on an annual basis. The 2019 resurfacing program, based on information from the Pavement Management Model, customer requests and staff observations, includes the following major and local roads:  

Back to top


2019 Major Roads

ROAD
  
STREET FROM STREET TO
Old Yale Road West End Mt. Lehman Road
Bevan Crescent  Peardonville Road Broadway Street
Maclure Road Gladwin Road  Railway O/P
Townshipline Road West End Lefeuvre Road
South Parallel Road McDermott Road No. 4 Road
King Road McKenzie Road 34281 King Road
Clearbrook Road South Fraser Way Old Yale Road
Vye Road Angus Campbell Road Intersection
Downes Road  Gladwin Road Seldon Road
Riverside Road  Industrial Way Vye Road 

Back to top


2019 Local Roads

ROAD
  
STREET FROM STREET TO
Kinsale Place West end Kimberley Street
Kimberley Street Ketch Place South End
Ketch Place McCallum Road West End
Ross Road Marsh-McCormick Road South cul-de-sac
Beaton Road Sorenson Avenue Riverside Street
Clayburn Road Gladwin Road Bridgeview Street
Fadden Road Wells Line Road North End
Pierce Terrace Bulkley Street Old Clayburn Road
Bulkley Street South End North End
Lakemount Road No. 4 Road North End
Ross Road Fraser Highway Maclure Road
Wells Line Road Lamson Road Fadden Road
Wells Gray Avenue McKee Road McKinley Drive
Autumn Avenue Peardonville Road Parkview Street 
Pineview Avenue  Clearbrook Road  Parkview Street 

Back to top


Project Schedule

The roadwork will take place between May and September 2019. Information signs will be installed at each work location informing customers about the construction activity. In addition, fronting properties will be notified by hand-delivered letter about five days before the start of construction. 
 
Please note, that paving work is dependent on the weather so there may be delays in the schedule. In addition, to maximize efficiency, staff and the contractor may be working at several sites concurrently resulting in some inconvenience or traffic delays. 

Back to top


Hours of Work

Construction activity will be restricted to the hours of 7:00 am to 7:00 pm (Monday to Friday), and 7:00 am to 5:00 pm (Saturday). The Contractor will provide a minimum of 24 hours advance notice of any required service or traffic interruptions that will affect area residents, businesses and utility owners. 

Back to top


Access During Construction

The contractor will be required to keep streets open to through traffic during normal business hours, although some redirection of traffic may be necessary. Traffic control personnel will be present to direct vehicles and pedestrians safely. Temporary parking restrictions may also be required for the proposed works. 

Thank you for your patience.  If you have any questions about summer maintenance, please email Keith Martin, Manager of Roads, or call 604-853-5485.